Services · Foundational

Field Asset and Equipment Control Procedure

AMP04

Documents controls for assets and equipment deployed to branches, projects, volunteers or field teams, including assignment, movement, maintenance and return. Includes asset registration and tagging, custody and accountability assignment, periodic physical verification and stock counts, and inter-branch / inter-project asset transfer controls.

What changes

Better safeguarding of field assets, clearer custody records, reliable physical verification routines and fewer untracked equipment movements.

What you get

  1. Field asset and equipment control procedure AMP015
  2. Asset assignment and accountability form AMP016
  3. Inter-branch / inter-project transfer note AMP017
  4. Field asset verification sheet AMP018

What has to come first

Who is involved

From the National Society's side. This is what the engagement asks of your people.

Your own staff work alongside the adviser throughout, so this is a commitment of their time as well as the Centre's. Ask in the request and you are given the day estimate per role before anything is signed.

RoleWhat they do
HNS Finance DirectorOwns the link to the central register
HNS asset or logistics officerMaintains field records, runs verification
HNS branch managers and project leadsHold and account for field assets
HNS field staff and volunteersNamed custodians of assigned equipment
HNS internal audit functionTests field asset controls, where it exists
GFDC delivery teamDrafts and advises

How it is measured

IndicatorTargetEvidence
Field asset procedure approved and issued Approved within 7 weeks of kick-off Approval record; issued procedure
Field assets assigned to a named custodian 100% of in-scope field assets Asset assignment and accountability forms
Inter-branch / inter-project movements with a signed transfer note 100% of movements Transfer notes; updated central register
Field assets verified and reconciled to the central register At first verification, then on cycle Field asset verification sheet

Tools

4 of 4 ready to download.

  • AMP015 Field asset and equipment control procedure Template DOCX
  • AMP016 Asset assignment and accountability form Template DOCX
  • AMP017 Inter-branch / inter-project transfer note Template DOCX
  • AMP018 Field asset verification sheet Template DOCX

Standards

  • COSO Internal Control - Integrated Framework
  • COSO Enterprise Risk Management (ERM) Framework
  • IPSAS 17 - Property, Plant and Equipment (IAS 16 equivalent under IFRS reporting)

Describe the problem, not the service

You do not need to know which of the 124 to ask for.